The Catch-Up #9: Happy New Year

Happy New Year and welcome to your first catch-up of 2025, getting you ready for the first full week of work as things get up and running in January.

To kick things off, we’re looking back at 2024 which has been declared to be the “cleanest ever” for UK electricity by Carbon Brief. Its analysis found carbon dioxide emissions have fallen by more than two-thirds in a decade, driven by the UK phasing out coal and getting less than half as much electricity from burning fossil fuels as it was a decade ago. Of course, in the same timeframe, renewable generation has doubled.

This led to fossil fuels accounting for just 29% of the UK’s electricity in 2024 which was the lowest on record, as renewables hit a record high of 45%. Nuclear accounted for 13%. This meant that each unit of electricity generated last year had an average of 124g of CO2, compared to a carbon intensity of 419g of CO2 per kilowatt hour back in 2014.

Launched right before Christmas, the government is looking to further clean up the UK’s emissions by asking industry how best to deliver its manifesto commitment to restore the 2030 phase out date for new petrol and diesel cars.

The previous government had extended the phase out to 2035, despite two-thirds of industry having claimed to be ready to meet the phase out as it was and announcing plans to do so. The government says this consultation will help bring much-needed clarity back to industry, with it also seeking views on flexibilities in the Zero Emission Vehicle Mandate through to 2030. This will include extending existing ones out to 2026, as well as exploring if new flexibility to trade emissions across vans and car fleets should be considered.

The consultation is due to run until 11:59PM on 18 February.

The government has also announced that new waste incinerators will only be granted planning approval if they are able to meet strict new local and environmental conditions. Setting the scene, it outlined how over the last 14 years, recycling rates have stalled in England. This has seen too much waste being dealt with through incineration or being thrown into landfill. Close to half (49%) of all waste collected by local authorities between 2022 and 2023 was incinerated, with just 40% being recycled.

Now, moving forwards, projects will only be approved if they can maximise efficiency, supporting the delivery of economic growth, net zero and the move to a circular economy. The onus will be on developers to show their projects will help lower the amount of non-recyclable waste sent to landfill, or enable the replacement of older, less efficient plants. Further requirements include showing that new projects are built carbon capture ready, once requirements come into force, and how they will make use of the heat they produce. This will include plants that produce fuels that can be used to decarbonise other sectors.

There will also be a need to outline how new waste incinerators will meet existing high standards on air pollution and other environmental impacts in order to be granted an environmental permit.

Finally, at a local level, Suffolk County Council has once more challenged National Grid and the government on energy projects. Linking up with Essex, Norfolk and Lincolnshire County Councils, it explained all are facing similar challenges with Nationally Significant Infrastructure Projects (NSIPs).

For Suffolk, its main concerns are what it calls an uncoordinated approach to NSIPs, claiming this is creating “significant challenges” for Suffolk’s rural communities under the current planning policy as applied by the Planning Inspectorate and Secretary of State, and the government’s 2030 target for decarbonising the electricity grid. According to Suffolk County Council, this target is “too hasty” and is making it impossible to deliver alternative solutions to pylon projects such as Norwich to Tilbury.

Also in the news:

Contracts signed for first three HAR1 projects: The Low Carbon Contracts Company has signed the first three of 11 landmark hydrogen production contracts under Hydrogen Allocation Round 1 (HAR1), with these totalling a collective 31.8MW of capacity. The remaining contracts should be signed early this year.

South Norfolk Council backs rooftop solar campaign: South Norfolk Council has joined the backers of Campaign for Rural England’s rooftop solar campaign, which calls on the government to introduce a national rooftop solar target by 2035.

Norfolk schools awarded active travel grants: 10 schools across Norfolk have been awarded £5,000 grants to support them in introduce new active travel and road safety initiatives for pupils.

Solar panels for Riverside Leisure Centre: Plans have been unveiled for more than 600 solar panels to be installed on the rooftop of the Riverside Leisure Centre in Norwich, helping to cut its electricity bills by 33% and save 75 tonnes of carbon emissions each year.

Share the Post:
We use cookies to ensure that we give you the best experience on our website. Read our cookie policy